Difference between revisions of "Hon Lam"
(→Project 3) |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 78: | Line 78: | ||
==Assignment 4== | ==Assignment 4== | ||
− | [http://www.sfu.ca/~hcl/A4_01/applet/] | + | [http://www.sfu.ca/~hcl/A4_01/applet/ Editor 2] |
Just realized I made a incorrect link to A3_01 instead of A4_01. Sorry | Just realized I made a incorrect link to A3_01 instead of A4_01. Sorry | ||
Line 96: | Line 96: | ||
'''Pie Chart''' | '''Pie Chart''' | ||
− | + | [http://www.sfu.ca/~hcl/Gain_Loss_Pie_Chart/applet/ Gain/Loss Pie Chart] | |
+ | |||
+ | Hi Everyone: | ||
+ | |||
+ | After watching so many wonderful presentations, I feel quite embarrass with my final project. My program is quite simply compared to everyone. It is meant to give a person a quick overview of his or her portfolio in a pie chart setting. I used the Dow 30 as my portfolio. The first pie chart (called whole) shows the overall performance of the portfolio. The second pie chart (called sector) show the performance in each sector. The final pie chart (called individual) shows individual stock performance. For the sector and individual pie chart, the size of each pie section presents the composition of the portfolio and the blue and red represents year-to-date gain or loss, respectively. I tried placing labels on the sections but I had difficulty tagging each section correctly. That is why there are no tags and something I need to work on. | ||
+ | |||
+ | Hon |
Latest revision as of 20:54, 9 December 2008
Contents
Assignment 2
Assignment 1
Assignment 3
Project 2
My editor will be able to draw predefined shapes (triangle, circle, and square) in different colors. The editor can erase part with a square eraser. Colours will be determined by a patch on the corner of the screen and the user can determine the color by clicking on the space bar. Finally, the shape can be scaled smaller or larger depending on the up and down arrow keys. All features will be displayed along side the applet.
Project 2 The Editor
[Editor]
Assignment 4
Just realized I made a incorrect link to A3_01 instead of A4_01. Sorry
Project 3
Part 1
Title: Pie Chart Segregater
Description: I will created a 2D chart segregating a portfolio of 20 stocks into its respective industry and having color to represent performance (i.e., red showing lost and blue showing gain). One year period will be used to generated as data for the project.
Purpose: The segregater is meant to give investors a quick look into which sector is performing well and what is the overall performance of the portfolio.
Technical Details: The visualization will be built using Processing and data will be coming from Yahoo Finance (in a CSV file but may be converted to another data format).
Project 3
Pie Chart
Hi Everyone:
After watching so many wonderful presentations, I feel quite embarrass with my final project. My program is quite simply compared to everyone. It is meant to give a person a quick overview of his or her portfolio in a pie chart setting. I used the Dow 30 as my portfolio. The first pie chart (called whole) shows the overall performance of the portfolio. The second pie chart (called sector) show the performance in each sector. The final pie chart (called individual) shows individual stock performance. For the sector and individual pie chart, the size of each pie section presents the composition of the portfolio and the blue and red represents year-to-date gain or loss, respectively. I tried placing labels on the sections but I had difficulty tagging each section correctly. That is why there are no tags and something I need to work on.
Hon