Difference between revisions of "Hon Lam"
(→Project 3) |
|||
Line 90: | Line 90: | ||
'''''Technical Details:''''' The visualization will be built using Processing and data will be coming from Yahoo Finance (in a CSV file but may be converted to another data format). | '''''Technical Details:''''' The visualization will be built using Processing and data will be coming from Yahoo Finance (in a CSV file but may be converted to another data format). | ||
+ | |||
+ | ==Project 3== | ||
+ | '''Pie Chart''' | ||
+ | |||
+ | Coming Soon... |
Revision as of 17:44, 1 December 2008
Contents
Assignment 2
Assignment 1
Assignment 3
Project 2
My editor will be able to draw predefined shapes (triangle, circle, and square) in different colors. The editor can erase part with a square eraser. Colours will be determined by a patch on the corner of the screen and the user can determine the color by clicking on the space bar. Finally, the shape can be scaled smaller or larger depending on the up and down arrow keys. All features will be displayed along side the applet.
Project 2 The Editor
[Editor]
Assignment 4
Project 3
Part 1
Title: Pie Chart Segregater
Description: I will created a 2D chart segregating a portfolio of 20 stocks into its respective industry and having color to represent performance (i.e., red showing lost and blue showing gain). One year period will be used to generated as data for the project.
Purpose: The segregater is meant to give investors a quick look into which sector is performing well and what is the overall performance of the portfolio.
Technical Details: The visualization will be built using Processing and data will be coming from Yahoo Finance (in a CSV file but may be converted to another data format).
Project 3
Pie Chart
Coming Soon...